Two Chamberlain Square, Birmingham, UK - City architecture

Two Chamberlain Square is a build for commercial use that includes 183,000 sq.ft of grade A offices over 8 floors. There will also be 2,780 to 4,310 sq. ft of retail units available.


Two Chamberlain Square

Birmingham 

B3 3AX

View site map HERE

 

Architect: Glenn Howells

Construction: BAM

Developer: Argent LLP

 

In brief

Two Chamberlain Square is the second of the stunning buildings to open as part of Argent's huge and transformative Paradise development,

The building was designed by Glenn Howells Architects and built by BAM.

Two Chamberlain Square is an eight storey development of prime office space. 

Photography by Daniel Sturley

 

Story so far

February 2017

The construction of Two Chamberlain Square commences.

 

March 2017

 

April 2017

 

May 2017

 

June 2017

 

July 2017

 

August 2017

 

September 2017

 

October 2017

The huge floor plates of Two Chamberlain Square on the lower levels become very apparent from the Library

.

 

November 2017

 

December 2017

 

January 2018

 

February 2018

From the Library Two Chamberlain Square still looks like a huge slab as more demolition is done around the Paradise site.

 

April 2018

 

May 2018

 

June 2018

The first columns of Two Chamberlain Square rise above the hordings along Centenary Way.

 

 

July 2018

The structure of Two Chamberlain Square becomes apparent as it rises.

 

 

August 2018

The scene in Chamberlain Square develops as Two Chamberlain Square rises behing the Chamberlain Monument.

 

September 2018

 

October 2018

Demolition to make way for One Centenary Way, Two Chamberlain Square behind.

 

November 2019

 

December 2019

 

January 2019

 

February 2019

Two Chamberlain Square receives its first column cladding.

 

March 2019

Two Chamberlain Square gets some of its first glazing teasing us with reflective splendor to come.

 

April 2019

Two Chamberlain Square is topped out with much of the Colomn cladding completed.

 

May 2019

 

June 2019

The fully glazed front of Two Chamberlain Square.

 

July 2019

 

August 2019

One and Two Chamberlain Square as seen from the Hyatt Regency Hotel.

 

September 2019

 

October 2019

External completion of Two Chamberlain Square.

 

November 2019

 

December 2019

 

January 2021

 

February 2021

 

March 2021

Two Chamberlain Square in the fully reopened square.

 

All photography by Daniel Sturley

See the full construction gallery of hundreds of photos covering the whole build here: FULL GALLERY

 

 

Project dates

26 Jun 2018 - On-going

Passions

Construction & regeneration, Shopping, People & community
Modern Architecture

You might like

Contact

Your Place Your Space

Daniel Sturley

0121 410 5520


Related posts

Construction & regeneration
31 Oct 2018 - Your Place Your Space
Introducing

Introducing Two Chamberlain Square, Birmingham, UK

Post image

Take the full post for full details of Two Chamberlain Square, Birmingham, UK. 

Related

Introducing Two Chamberlain Square, Birmingham, UK





Take the full post for full details of Two Chamberlain Square, Birmingham, UK. 


PROJECT DETAIL:

2nd building of ten in the overall ‘Paradise’ 1.8 million sq. ft. development

USE:

Speculatively built 183,000 sqft grade A offices. 8 floors. 2,780 to 4,310 sq ft retail units available.

DEVELOPMENT PARTNERS:

Paradise Circus Limited Partnership (PCLP)

Birmingham City Council

BT Pension Scheme

Hermes Investment Management

Argent 

ARCHITECTS:

Glenn Howells Architects 

CONTRACTOR:

BAM Construction 

PLANNING APPLICATION NUMBER:

2015/05009/PA (Reserved Matters)
2014/05319/PA (Variation Of Condition)
2012/05116/PA (Outline)
(https://bit.ly/2qQZ32O)

ARTIST'S IMPRESSIONS from Glenn Howells Architects

dndimg alt="" dndsrc="../uploadedfiles/Two Chamberlain Square Artists Impression 001.jpg" style="width: 100%;" />

 

 

 

Share  Connect with us
60 passion points
Construction & regeneration
07 Nov 2019 - Daniel Sturley
Gallery

The Construction of Two Chamberlain Square - November 2019

Post image

Two Chamberlain Square currently offers some great reflections of the Museum and Art Gallery, the Joseph Chamberlain Monument and the Council House while we wait for the new renovated Chamberlain Square to open. All these taken from the entrance to the Museum.

Related

The Construction of Two Chamberlain Square - November 2019





Two Chamberlain Square currently offers some great reflections of the Museum and Art Gallery, the Joseph Chamberlain Monument and the Council House while we wait for the new renovated Chamberlain Square to open. All these taken from the entrance to the Museum.


dndimg alt="" dndsrc="../uploadedfiles/IMG_2276b_CHBSQ.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2282b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2261b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2259b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2241b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2236b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2230b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2210b_2CS.jpg" style="width: 100%;" />

Photos by Daniel Sturley

Share  Connect with us
100 passion points
Construction & regeneration
11 Oct 2019 - Daniel Sturley
Gallery

The Construction of Two Chamberlain Square - October 2019

Post image

Here's a small gallery of recent photos of the externally completed Two Chamberlain Square. This feature project has photos covering the whole construction process, click 'related' to see the gallery and previous posts.

Related

The Construction of Two Chamberlain Square - October 2019





Here's a small gallery of recent photos of the externally completed Two Chamberlain Square. This feature project has photos covering the whole construction process, click 'related' to see the gallery and previous posts.


dndimg alt="" dndsrc="../uploadedfiles/IMG_0991b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0984b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0979b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0973b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0784b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0765b_2CS.jpg" style="width: 100%;" />

Photos by Daniel Sturley

Share  Connect with us
80 passion points
Construction & regeneration
29 Aug 2019 - Daniel Sturley
Gallery

The Construction of Two Chamberlain Square - August 2019

Post image

Here is the latest gallery of photos of Two Chamberlain Square which is externally completed and the fit out is commencing.

Related

The Construction of Two Chamberlain Square - August 2019





Here is the latest gallery of photos of Two Chamberlain Square which is externally completed and the fit out is commencing.


dndimg alt="" dndsrc="../uploadedfiles/IMG_7305b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_7246b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_7241b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_7165b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_7159b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_7123b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_7095b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_7089b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_7083b_2CS.jpg" style="width: 100%;" />

Photos by Daniel Sturley

Share  Connect with us
90 passion points
Construction & regeneration
26 Jul 2019 - Daniel Sturley
Gallery

The Construction of Two Chamberlain Square - July 2019

Post image

Here's a small gallery of construction photos from the nearly externally complete Two Chamberlain Square.

Related

The Construction of Two Chamberlain Square - July 2019





Here's a small gallery of construction photos from the nearly externally complete Two Chamberlain Square.


dndimg alt="" dndsrc="../uploadedfiles/IMG_3551b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3459b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3453b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3342b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3347b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3428b_1CS.jpg" style="width: 100%;" />

Photos by Daniel Sturley

Share  Connect with us
93 passion points
Construction & regeneration
11 Jul 2019 - Daniel Sturley
Gallery

The Construction of Two Chamberlain Square - June 2019

Post image

Construction photo update for Two Chamberlain Square which is nearing external completion.

Related

The Construction of Two Chamberlain Square - June 2019





Construction photo update for Two Chamberlain Square which is nearing external completion.


dndimg alt="" dndsrc="../uploadedfiles/IMG_1381b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1375b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1405b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1543b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1537b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1554b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1595b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1639b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1707b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1654b_2CS_2.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1715b_2CS.jpg" style="width: 100%;" />

Photos by Daniel Sturley

Share  Connect with us
90 passion points
Construction & regeneration
02 Jun 2019 - Daniel Sturley
Gallery

The Construction of Two Chamberlain Square - June 2019

Post image

The main progress on Two Chamberlain Square is the addition of the cladding to the front colonnade, not long till the re-opening of Chamberlain Square now!

Related

The Construction of Two Chamberlain Square - June 2019





The main progress on Two Chamberlain Square is the addition of the cladding to the front colonnade, not long till the re-opening of Chamberlain Square now!


dndimg alt="" dndsrc="../uploadedfiles/IMG_9332b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_9309b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_9287b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_9302b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_9317b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_9433b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_9338b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_9333b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_9264b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_9277b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_9254b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_9245b_2CS.jpg" style="width: 100%;" />

The test rig for the external cladding and windows for Two Chamberlain Square.

Photos by Daniel Sturley

Share  Connect with us
90 passion points
Construction & regeneration
19 May 2019 - Daniel Sturley
Gallery

The Construction of Two Chamberlain Square - May 2019

Post image

Two Chamberlain Square is well on the way to looking like a finished building, here's the latest construction photo gallery.

Related

The Construction of Two Chamberlain Square - May 2019





Two Chamberlain Square is well on the way to looking like a finished building, here's the latest construction photo gallery.


dndimg alt="" dndsrc="../uploadedfiles/IMG_8130b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_7857b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_8019b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_7844b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_7837b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_7840b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_7834b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_7630b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_7552b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_7564b_2CS.jpg" style="width: 100%;" />

Photos by Daniel Sturley

Share  Connect with us
90 passion points
Construction & regeneration
12 Apr 2019 - Daniel Sturley
Gallery

The Construction of Two Chamberlain Square - April 2019

Post image

Lots of exterior progress at Two Chamberlain Square with all the first tier columns installed around the building and lots more of the windows.

Photo by Reiss Gordon Henry

Related

The Construction of Two Chamberlain Square - April 2019





Lots of exterior progress at Two Chamberlain Square with all the first tier columns installed around the building and lots more of the windows.

Photo by Reiss Gordon Henry


dndimg alt="" dndsrc="../uploadedfiles/IMG_4569b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4640b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4559b_2CS.jpg" style="width: 100%;" />

Photos by Daniel Sturley

 

dndimg alt="" dndsrc="../uploadedfiles/DSC_0326.jpg" style="width: 100%;" />

Photo by Stephen Giles

 

dndimg alt="" dndsrc="../uploadedfiles/IMG_4326b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4343b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4337b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4344b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4356b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4352b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4370b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4380b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4371b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4383_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4393b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4394b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4406b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4446b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4442b_2CS.jpg" style="width: 100%;" />

Photos by Daniel Sturley

Share  Connect with us
80 passion points
Construction & regeneration
02 Apr 2019 - Daniel Sturley
Gallery

The Construction of Two Chamberlain Square - March 2019

Post image

Windows have been installed on the back of the building and the exterior columns have been extended up around most of the sides.

Related

The Construction of Two Chamberlain Square - March 2019





Windows have been installed on the back of the building and the exterior columns have been extended up around most of the sides.


dndimg alt="" dndsrc="../uploadedfiles/IMG_3804b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3663b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3659b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3686b_2CS_2.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3683b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3794b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_3789b_2CS.jpg" style="width: 100%;" />

Photos by Daniel Sturley

Share  Connect with us
70 passion points
Construction & regeneration
26 Mar 2019 - Daniel Sturley
News & Updates

The Construction of Two Chamberlain Square - March 2019

Post image

Many more exterior columns have been installed, lots of great photos of the building from around the area in this gallery.

Photo by Stephen Giles

Related

The Construction of Two Chamberlain Square - March 2019





Many more exterior columns have been installed, lots of great photos of the building from around the area in this gallery.

Photo by Stephen Giles


Main Photo by Stephen Giles

dndimg alt="" dndsrc="../uploadedfiles/IMG_1632b_2CS_2019.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1651b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1640b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1654b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1771b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1763b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1822b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1827b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1846b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1632b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1843b_2CS.jpg" style="width: 100%;" />

Photos by Daniel Sturley

Share  Connect with us
90 passion points
Construction & regeneration
03 Mar 2019 - Daniel Sturley
Gallery

The Construction of Two Chamberlain Square - March 2019

Post image

There has been a lot of windows installed on the front of the building facing Chamberlain Square and another row of columns at the back start to show the way they will look. We cant wait for the full effect!

Related

The Construction of Two Chamberlain Square - March 2019





There has been a lot of windows installed on the front of the building facing Chamberlain Square and another row of columns at the back start to show the way they will look. We cant wait for the full effect!


dndimg alt="" dndsrc="../uploadedfiles/IMG_0867b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0808b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0797b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0768b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0886b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0881b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0754b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0448b_1CS_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0299b_1CS_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0302b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0344b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0381b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0373b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0317b_2CS.jpg" style="width: 100%;" />

Photos by Daniel Sturley

Share  Connect with us
90 passion points
Construction & regeneration
19 Feb 2019 - Daniel Sturley
Gallery

The Construction of Two Chamberlain Square - February 2019

Post image

A couple of windows have been installed on Two Chamberlain Square as the exterior columns rise, some nice views of the building as it sits amongst the city's classic and modern architecture. Lots of photos in the full post.

Related

The Construction of Two Chamberlain Square - February 2019





A couple of windows have been installed on Two Chamberlain Square as the exterior columns rise, some nice views of the building as it sits amongst the city's classic and modern architecture. Lots of photos in the full post.


dndimg alt="" dndsrc="../uploadedfiles/IMG_8857b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_8898b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_8947b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_9011b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_9136b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_9157b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_9246b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_9276b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_9266b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_9375b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_9403b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_9472b_2CS.jpg" style="width: 100%;" />

Photos by Daniel Sturley

Share  Connect with us
90 passion points
Construction & regeneration
08 Feb 2019 - Daniel Sturley
Gallery

The Construction of Two Chamberlain Square - February 2019

Post image

Two Chamberlain Square is onto cladding installation and the front colonnade extention is almost complete. The extra columns really help to start showing the emerging architectural style of the building. More photos in the full post.

Related

The Construction of Two Chamberlain Square - February 2019





Two Chamberlain Square is onto cladding installation and the front colonnade extention is almost complete. The extra columns really help to start showing the emerging architectural style of the building. More photos in the full post.


dndimg alt="" dndsrc="../uploadedfiles/IMG_1953b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1975b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1970b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2017b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_1981b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2030b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_2029b_2CS.jpg" style="width: 100%;" />

Photos by Daniel Sturley

Share  Connect with us
100 passion points
Construction & regeneration
25 Jan 2019 - Daniel Sturley
Gallery

The Construction of Two Chamberlain Square - January 2019

Post image

Two Chamberlain Square is now structurally complete, the front collanade almost finished, work on the exterior next. Local people will be able to stop calling it the 'car park' soon. More photos in the full post.

Related

The Construction of Two Chamberlain Square - January 2019





Two Chamberlain Square is now structurally complete, the front collanade almost finished, work on the exterior next. Local people will be able to stop calling it the 'car park' soon. More photos in the full post.


dndimg alt="" dndsrc="../uploadedfiles/IMG_0545b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0573b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0546b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0582b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0591b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0605b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0620b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0617b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0653b_2CS.jpg" style="width: 100%;" />

Photos by Daniel Sturley

Share  Connect with us
90 passion points
Construction & regeneration
01 Nov 2018 - Daniel Sturley
Gallery

The Construction of Two Chamberlain Square

Post image

Two Chamberlain Square is continuing to rise at Paradise Birmingham, it's now looming over Centenary Way producing a wide canyon feel on the way down to the Museum and Art Gallery.

Photo by Daniel Sturley

Related

The Construction of Two Chamberlain Square





Two Chamberlain Square is continuing to rise at Paradise Birmingham, it's now looming over Centenary Way producing a wide canyon feel on the way down to the Museum and Art Gallery.

Photo by Daniel Sturley


dndimg alt="" dndsrc="../uploadedfiles/IMG_5735b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_5752b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_5739b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_5718b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_5928b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_5827b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_5819b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_5807b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_5759b_2CS.jpg" style="width: 100%;" />

Photos by Daniel Sturley

Share  Connect with us
100 passion points
Construction & regeneration
01 Oct 2018 - Daniel Sturley
Gallery

The Construction of Two Chamberlain Square

Post image

Construction at Paradise Birmingham is accelerating with Two Chamberlain Square over two thirds up with it's main structure. View the full post for more.

Photo by Daniel Sturley

Related

The Construction of Two Chamberlain Square





Construction at Paradise Birmingham is accelerating with Two Chamberlain Square over two thirds up with it's main structure. View the full post for more.

Photo by Daniel Sturley


dndimg alt="" dndsrc="../uploadedfiles/IMG_4697b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4661b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4681b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4582b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4704b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4797b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4803b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4836b_2CS.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_4828b_2CS.jpg" style="width: 100%;" />

Photos by Daniel Sturley

Share  Connect with us
60 passion points
Construction & regeneration
21 Sep 2018 - Daniel Sturley
Gallery

The Construction of Two Chamberlain Square

Post image

Two Chamberlain Square has imposed itself on the scene at Paradise Birmingham and is continuing to rise, quite some square footage in this building! More photos in the full post.

Photo by Daniel Sturley

Related

The Construction of Two Chamberlain Square





Two Chamberlain Square has imposed itself on the scene at Paradise Birmingham and is continuing to rise, quite some square footage in this building! More photos in the full post.

Photo by Daniel Sturley


dndimg alt="" dndsrc="../uploadedfiles/IMG_0606b_003.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0552b_003.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0470b_003.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_0270b_003.jpg" style="width: 100%;" />

Photos by Daniel Sturley

Share  Connect with us
70 passion points
Construction & regeneration
19 Aug 2018 - Daniel Sturley
Gallery

The Construction of Two Chamberlain Square

Post image

Some shots from the Library of Birmingham in this update of the continuing construction of Two Chamberlain Square.

Photo by Daniel Sturley

Related

The Construction of Two Chamberlain Square





Some shots from the Library of Birmingham in this update of the continuing construction of Two Chamberlain Square.

Photo by Daniel Sturley


dndimg alt="" dndsrc="../uploadedfiles/IMG_7968b_002.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_7976b_002.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_8154b_002.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_7964b_002.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_8048b_002.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_8099b_002.jpg" style="width: 100%;" />

 

Photos by Daniel Sturley

Share  Connect with us
70 passion points
Construction & regeneration
18 Aug 2018 - Daniel Sturley
Gallery

Installation of the External Test Rig for Two Chamberlain Square

Post image

The test rig for the external structure of Two Chamberlain Square has been installed at the Summer Row side of the site.

Photo by Daniel Sturley

Related

Installation of the External Test Rig for Two Chamberlain Square





The test rig for the external structure of Two Chamberlain Square has been installed at the Summer Row side of the site.

Photo by Daniel Sturley


dndimg alt="" dndsrc="../uploadedfiles/IMG_8265b_002.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_8302b_002.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_8314b_002.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_8418b_002.jpg" style="width: 100%;" />

Photos by Daniel Sturley

Share  Connect with us
70 passion points
Construction & regeneration
10 Aug 2018 - Daniel Sturley
Gallery

The Construction of Two Chamberlain Square

Post image

The fourth floor of Two Chamberlain Square is almost complete in this update with photos from around the site showing the developing bulk of the building.

Photo by Daniel Sturley

Related

The Construction of Two Chamberlain Square





The fourth floor of Two Chamberlain Square is almost complete in this update with photos from around the site showing the developing bulk of the building.

Photo by Daniel Sturley


dndimg alt="" dndsrc="../uploadedfiles/IMG_7125b_002.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_6399b_002.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_6319b_002.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_7247b_002.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_7170b_002.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_7147b_002.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_7140b_002.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_7128b_002.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_7125b_002.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_7115b_002.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_7105b_002.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_7066b_002.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_7075b_002.jpg" style="width: 100%;" />

Photo by Daniel Sturley

Share  Connect with us
70 passion points
Construction & regeneration
23 Jul 2018 - Daniel Sturley
Gallery

The Construction of Two Chamberlain Square

Post image

Two Chamberlain Square is rising fast and has already produced a canyon feeling down Centenary Way, it is also looking big from the Museum and Art Gallery.

Photos by Daniel Sturley

Related

The Construction of Two Chamberlain Square





Two Chamberlain Square is rising fast and has already produced a canyon feeling down Centenary Way, it is also looking big from the Museum and Art Gallery.

Photos by Daniel Sturley


dndimg alt="" dndsrc="../uploadedfiles/IMG_5574b_002.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_5536b_002.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_5510b_002.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_5597b_002.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_5589b_002.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_5638b_002.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_5612b_002.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_5675b_002.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_5686b_002.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_5689b_002.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/IMG_5754b_002.jpg" style="width: 100%;" />

Photos by Daniel Sturley

Share  Connect with us
70 passion points
Construction & regeneration
25 Jun 2018 - Daniel Sturley
Gallery

The Construction of Two Chamberlain Square

Post image

The construction of Two Chamberlain Square moves on to the third floor and is rising fast, nice blue sky shots for this update.

Photos by Daniel Sturley

Related

The Construction of Two Chamberlain Square





The construction of Two Chamberlain Square moves on to the third floor and is rising fast, nice blue sky shots for this update.

Photos by Daniel Sturley


dndimg alt="" dndsrc="../uploadedfiles/IMG_1783b.jpg" style="width: 100%;" />

 

 

dndimg alt="" dndsrc="../uploadedfiles/IMG_1899b_002.jpg" style="width: 100%;" />

 

 

dndimg alt="" dndsrc="../uploadedfiles/IMG_1913b_002.jpg" style="width: 100%;" />

 

 

dndimg alt="" dndsrc="../uploadedfiles/IMG_1904b.jpg" style="width: 100%;" />

 

Photos by Daniel Sturley

Share  Connect with us
70 passion points
Construction & regeneration
17 Jun 2018 - Daniel Sturley
Gallery

The Construction of Two Chamberlain Square

Post image

The weather was less than favorable for this update but there are some nice angles of the building as it starts to rise.

Photos by Daniel Sturley

Related

The Construction of Two Chamberlain Square





The weather was less than favorable for this update but there are some nice angles of the building as it starts to rise.

Photos by Daniel Sturley


dndimg alt="" dndsrc="../uploadedfiles/IMG_0743b.jpg" style="width: 100%;" />

 

 

dndimg alt="" dndsrc="../uploadedfiles/IMG_0740b.jpg" style="width: 100%;" />

 

 

dndimg alt="" dndsrc="../uploadedfiles/IMG_0817b.jpg" style="width: 100%;" />

 

 

dndimg alt="" dndsrc="../uploadedfiles/IMG_0806b.jpg" style="width: 100%;" />

 

Photos by Daniel Sturley

Share  Connect with us
70 passion points
Construction & regeneration
27 May 2018 - Daniel Sturley
Gallery

The Construction of Two Chamberlain Square

Post image

A nice sunny day for this photo gallery update of the construction of Two Chamberlain Square as seen from Centenary Walk. Some of the new structure seen is for One Centenary Walk.

Related

The Construction of Two Chamberlain Square





A nice sunny day for this photo gallery update of the construction of Two Chamberlain Square as seen from Centenary Walk. Some of the new structure seen is for One Centenary Walk.


dndimg alt="" dndsrc="../uploadedfiles/IMG_9235b.jpg" style="width: 100%;" />

 

 

dndimg alt="" dndsrc="../uploadedfiles/IMG_9232b_002.jpg" style="width: 100%;" />

 

 

dndimg alt="" dndsrc="../uploadedfiles/IMG_9210b_002.jpg" style="width: 100%;" />

 

 

dndimg alt="" dndsrc="../uploadedfiles/IMG_9220b_002.jpg" style="width: 100%;" />

 

 

dndimg alt="" dndsrc="../uploadedfiles/IMG_9256b.jpg" style="width: 100%;" />

 

 

dndimg alt="" dndsrc="../uploadedfiles/IMG_9250b.jpg" style="width: 100%;" />

 

Photos by Daniel Sturley

Share  Connect with us
60 passion points
Construction & regeneration
12 May 2018 - Daniel Sturley
Gallery

The Construction of Two Chamberlain Square

Post image

The construction of Two Chamberlain Square has really sped up! There's lots of new structure and frameworks ready for more in this photo update from last weekend.

Related

The Construction of Two Chamberlain Square





The construction of Two Chamberlain Square has really sped up! There's lots of new structure and frameworks ready for more in this photo update from last weekend.


dndimg alt="" dndsrc="../uploadedfiles/IMG_5184b_002.jpg" style="width: 100%;" />

 

 

dndimg alt="" dndsrc="../uploadedfiles/IMG_5189b.jpg" style="width: 100%;" />

 

 

dndimg alt="" dndsrc="../uploadedfiles/IMG_5223b.jpg" style="width: 100%;" />

 

 

dndimg alt="" dndsrc="../uploadedfiles/IMG_5224b.jpg" style="width: 100%;" />

 

 

dndimg alt="" dndsrc="../uploadedfiles/IMG_4999b.jpg" style="width: 100%;" />

 

 

dndimg alt="" dndsrc="../uploadedfiles/IMG_5038b_002.jpg" style="width: 100%;" />

 

 

dndimg alt="" dndsrc="../uploadedfiles/IMG_5149b.jpg" style="width: 100%;" />

 

Photos by Daniel Sturley

Share  Connect with us
60 passion points
Construction & regeneration
23 Oct 2017 - Daniel Sturley
News & Updates

The Construction of Two Chamberlain Square

Post image

Two Chamberlain Square is well on the way to rising now, it looks like new floors will start soon.

Related

Share  Connect with us
0 passion points
Construction & regeneration
16 Oct 2017 - Daniel Sturley
News & Updates

The Construction of Two Chamberlain Square

Post image

Two Chamberlain Square is really speeding up now that the basement structure is up to ground level. Click 'View Article' to see some more photos of the construction.

Related

The Construction of Two Chamberlain Square





Two Chamberlain Square is really speeding up now that the basement structure is up to ground level. Click 'View Article' to see some more photos of the construction.


dndimg alt="" dndsrc="../uploadedfiles/IMG_8795b.jpg" />

 

 

 

dndimg alt="" dndsrc="../uploadedfiles/IMG_8839b.jpg" />

 

 

 

dndimg alt="" dndsrc="../uploadedfiles/IMG_8796b.jpg" />

 

 

 

dndimg alt="" dndsrc="../uploadedfiles/IMG_8840b.jpg" />

 

 

Photos by Daniel Sturley

Share  Connect with us
5 passion points
Construction & regeneration
01 Oct 2017 - Daniel Sturley
News & Updates

The Construction of Two Chamberlain Square

Post image

The structure of Two Chamberlain Square is now at street level and will soon start to rise.

Related

Share  Connect with us
0 passion points
Close and return